SECTION 3301 GENERAL
* * *
[Delete Section 3301.3 and replace as follows:]
B-3301.3 Duration. Temporary construction, scaffolding, and encroachments shall be removed from a construction site after the final inspection is made by the code official or within 30 days after the fulfillment of the requirements of the permit.
* * *
Cite as: Phila. Code Title 4, § B-3301 — https://phillycitylaw.pages.dev/title-4/B-3301