SECTION 3301 GENERAL


SECTION 3301 GENERAL

* * *

[Delete Section 3301.3 and replace as follows:]

B-3301.3 Duration. Temporary construction, scaffolding, and encroachments shall be removed from a construction site after the final inspection is made by the code official or within 30 days after the fulfillment of the requirements of the permit.

* * *

Cite as: Phila. Code Title 4, § B-3301 — https://phillycitylaw.pages.dev/title-4/B-3301